Contracts have now been successfully concluded on another M+W Group construction project. Riddell PM will now manage the production of a suite of O&M manuals for their £111m Energy Works Facility in Hull which is expected to handover in early 2018.
Located in Hull’s industrial heartland, Energy Works will produce and export electricity to the National Grid. The initial phase of works will provide a minimum of 25MWe of electricity through a Fluidised Bed Gasification Plant and this will be supplemented with 36kWp of electricity through rooftop deployed Solar Panels. A planned future phase will produce an additional 3MWt of electricity through an Anaerobic Digestion Facility.
Riddell PM continues to support renewable and sustainable solutions for Energy from Waste schemes. In September we received an appointment to manage the collation and production of Operation and Maintenance Manuals for Interserve Construction at their 30MW Dunbar Energy from Waste Facility.
in late 2016, Riddell PM were contracted as M+W Group's O&M Manual provider for their Levenseat EfW Plant in Forth, central Scotland.