Riddell PM won this Contract to produce the Building O&M Manuals for The Clydeside Distillery in Glasgow, after completing several other projects with Mclaughlin & Harvey. The project encompasses two key elements; the restoration of Glasgow’s iconic B listed pump house building and the creation of a modern distillery, visitor centre and museum..
The historic clock tower and pump house, originally built in 1877, was transformed into a visitor centre, shop and café with twin two tonne copper stills within a contemporary glazed extension. The tasting room, located on the mezzanine level, opens up to create a stunning, bespoke event space for up to 200 guests..
The restoration works involved the removal of asbestos containing materials throughout the pump house, masonry repairs, overhauling the existing roofs and windows and the construction of a new visitor centre and distillery.
The extension comprised of piled foundations, structural steelwork frame, cladding to walls and roof, curtain walling and external doors and windows.
Riddell PM undertook the production of the Building Fabric Manual & BREEAM Building User Guide
Please call us to see how we can:
Leaving your team to focus on building construction. We look forward to your call today.